SPOTIFY GRAMMYS NIGHT

SPOTIFY (via Pink Sparrow)

The Spotify Grammys evening build featured a long, illuminated entrance hall, and Pink Sparrow was the shop equipped to handle the job. Eiji was involved in electrical and installation for this project. He helped fabricate the acrylic Spotify & Bug signs, assembled and installed the illuminated artist signs, and led the roof portion of the build with a small team of three. We had significant rain overnight throughout the installation process, and my team was responsible for covering and uncovering the roof with tarp daily. Eiji was also involved with the photo wall: installing the fabric and helping secure ballasts from the rear.

DELIVERABLES

- COVERED ENTRYWAY

- PHOTO WALL ASSEMBLY

-SCENIC FINISHING

PROJECT SUMMARY | KEY TASKS

- ELECTRICAL RUNS

- SIGN FABRICATION AND INSTALLATION

- DAILY TARP COVERAGE

- STRUCTURE ASSEMBLY AND FINISHING

-SANDING, PAINTING, SCENIC DRESSING

Previous
Previous

IT COSMETICS CONVENTION BOOTH

Next
Next

2022 NFL DRAFT SIGN